Rm-materials-handling WIRE ROPE PACKAGES Manual do Utilizador Página 15

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 76
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 14
R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319
15/76
R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.
To notice when assembling a festoon
Make sure that the joint (part no. 3) is smooth for trolley (part no. 6) to travel.
Pendant trolley will be assembled in the outer c-rail from the crane.
Tighten strain relief wires on both sides of the plug so that the pendant cable is either on loop or
on pleat. When looped, there will be better possibilities on adjusting the cable length.
Tighten the wire clamp.
Pendant
Vista de página 14
1 2 ... 10 11 12 13 14 15 16 17 18 19 20 ... 75 76

Comentários a estes Manuais

Sem comentários